03.
Apply the 2nd valley-fold of the step #2 and then unfold.
Prepare to apply a 3rd valley-fold and then unfold.
04.
Apply the 3rd valley-fold of the step #3 and then unfold.
Prepare to apply a 4th valley-fold and then unfold.